Search Beville.com

This website does not use cookies. Read Privacy Policy here.
.
Beville Logo - human factors engineering consultants

Beville's Non-Intrusive Console Workload Assessment

NEWSLETTER ARTICLE

Beville has documented the activities of nearly 1000 petrochemical plant operators during more than 7000 hours of direct observation. For console operators alone, we have analyzed over 250 positions with more than 2000 hours in control rooms. All of these activities have been recorded and documented in Beville's workload database.

Alarms & Control Moves vs Total Workload

Building on this data, we have developed a method of quickly and non-intrusively providing a general assessment of console operator workload based on DCS data, specifically alarms and control moves (figure above). The technique requires that a company provide one month of control move and alarm data from which an estimate of total current console workload is calculated. An example of the results of this analysis is shown in the table below. (Note: Numbers shown are for illustrative purposes and do not constitute real data or analysis.)

Unit Control Moves/Hr Alarms/Hr Required Staffing (FTE)
Unit 1 4.2 2.5 0.52
Unit 2 6.8 7.5 0.76

In this example, Unit 1 workload requires a little over half of a full time operating position. In addition to providing valuable data on current workload, any disproportionate contributors to workload from either alarms or control actions are identified, providing the necessary information for companies to take concrete actions to manage console operator workload. Further, in areas where operators are under-loaded, this analysis provides the data necessary to identify consolidation options.

Copyright 2010 Beville Operator Performance Specialists, Inc., All Rights Reserved

For further information, visit the links below.

| Alarm & Display System Analysis Overview | Alarm Management | Display Design | Alarm & Display Design Seminar | Beville Shape Calculator -Excel download | Alarm Distribution Estimator - Excel download |


RELATED EXTERNAL MEDIA

Article Published By
Consortium Reports New Findings on Alarm Rates Automation World
How Many Alarms Can An Operator Handle Chemical Processing
Operator Interfaces: Moving from Comfortable to Most Effective Automation World
BEVILLE NEWS

The 2024 Spring Meeting of the Center for Operator Performance will take place on April 16-18, 2024, in Pine Bend, MN/Hybrid. For more information on this and future meetings, please contact Lisa Via. Guests are always welcome!

Our most recent newsletter is now available. Click here!


David Strobhar's book, "Human Factors in Process Plant Operation," is now available in both hardcover and Kindle e-book.

Copyright 1996-2024 Beville Operator Performance Specialists, Inc. All rights reserved. (937)434-1093. Beville@Beville.com